LA Davies Construction

A full range of services are available,including, but not limited to,excavation for footings, surface stripping for new build, spoil removal or bunding and steel fixing to any requirement.

Concrete finishing to any specification from tamp,for footings ect. To brush finish for traffic use, to power float finish for internal floors. All concrete is vibrated on laying to expel maximum air and compact the product for maximum consolidation and can be edged to any profile e.g. arris or Bull Nose etc..Method statements and risk assessments can be provided where requested.

Contracts have included work for:-

  • Speedy Hire installing various sized wash bays with silt traps and oil separators to local and national required standards.
  • Great Bear warehousing and distribution concrete repairs to lorry loading ares, lorry parking areas, internal warehouse floor areas and deluge draining systems.
  • Elliot accommodation and equipment hire repairing concrete yard, loading and storage areas
  • National Tyres Ltd. Installation of bays for M.O.T. Testing stations.
  • Viking International Ltd. Concrete repairs to loading areas and installation of concrete pads for canopy covers.
  • Work undertaken on "live" and new units with flexibility to co-operate with the requirements of staff and business needs.

Testimonials

quoteWe at Grattan Developments Ltd, have had the opportunity to work with L.A.Davies on many occasions over several years and have always been impressed by the proactive approach to which they approach and undertake the work.

Ian Davies
Grattan Developments Ltd


quoteVery competent contractor in all regions of groundworks and concreting, handles any job I give them with ease.

Mark Abbott
Abbott Building Ltd